Norway, 2025 Scope of work:
-
Modernized an existing fuel tank and converted it into a Hybrid Battery System room
-
Installed a new SCR Catalyst system
-
Removed old silencers and installed new exhaust silencers
-
Prefabricated piping at the AVS Workshop in Klaipėda based on client-provided documentation
-
Conducted 3D modeling of new pipeline sections to optimize production and installation
-
Installed a 20-ton lifting capacity crane, ensuring precise and safe positioning