fbpx

TANKER

France, 2021

Scope of work:

  • In short time completed whole LNG sub-cooler piping prefabrication and installation on board;
  • Prefabricated and installed total piping length – 1130 m;
  • Installed various equipment and foundations for equipment;
  • Systems modified: LNG, CO2, Glycol, Sea Water cooling, Hydraulic, Sea Water Spray.