France, 2021
Scope of work:
- In short time completed whole LNG sub-cooler piping prefabrication and installation on board;
- Prefabricated and installed total piping length – 1130 m;
- Installed various equipment and foundations for equipment;
- Systems modified: LNG, CO2, Glycol, Sea Water cooling, Hydraulic, Sea Water Spray.