Denmark, 2023 Scope of work: Modernization of the engine exhaust gas line – installation of scrubbers. Installation of new chimneys and chemical tanks. Production
Denmark, 2023 Scope of work: Modernization of the engine exhaust gas line – installation of scrubbers. Installation of new chimneys and chemical tanks. Production
Denmark, 2023 Scope of work: Modernization of the existing ballast system – production and installation of the BWTS system. Modernization of the sewage system
France, 2022 Scope of work: Modernization of the LNG pipeline system. Engine exhaust gas line modernization – SRC system installation. Installation of platforms, foundations,
Denmark, 2023 Scope of work: Manufacture of stainless steel pipes for the LNG line. Installation of LNG and other gas pipelines. Installation of hydraulic
France, 2023 Scope of work: Installation of cooling equipment. Installation of service systems for LNG pipelines and cooling equipment. Installation of structures – installation
Norway, 2022 Scope of work: The existing ballast pipelines were replaced and the diameter of the pipelines was increased. Manufactured and installed steel and
Denmark, 2022 Scope of work: Dismounting of old BWTS system. BWTS system installation. 3D Design works for new pipelines. Piping systems installed: Ballast piping.
Denmark, 2022 Scope of work: BWTS system installation. Design works for new pipelines. Piping systems installed: Ballast piping. Air supply lines to new equipment
Lithuania, 2022 Scope of work: BWTS Pipes and Equipment foundations prefabricated in our workshop BWTS system installation was performed during the voyage of the
Sweden, 2022 Scope of work: Ballast water treatment system pipes production in AVS workshop. Ballast Water treatment system pipes and equipment installation on board.
Denmark, 2022 Scope of work: Ballast water treatment system pipes production in AVS workshop. Ballast Water treatment system pipes and equipment installation on board.
Denmark, 2021 Scope of work: Ballast water treatment system pipes production in AVS workshop. Ballast Water treatment system pipes and equipment installation on board.
Sweden, 2021 Scope of work: Cooling water piping system installation (total installed pipe length – 1000m) Manufacturing and installation of pipes Pressure tests
Sweden, 2021 Scope of work: 8 tons of BWTS (ballast water treatment system) pipe products were manufactured at the workshop Installation of BWTS pipelines
Sweden, 2021 Scope of work: Manufacturing and installation of GRE and steel pipe spools. Two more BWTS systems were successfully installed ad connected!
Sweden, 2021 Scope of work: 33 tons of steel piping were manufactured, galvanized, and installed onboard 140 meters or GRE piping lines were manufactured
Sweden, 2021 Scope of work: In the short term prefabricated and installed GRE pipe spools for BWTS system; Installation of foundations for equipment and
France, 2021 Scope of work: In short time completed whole LNG sub-cooler piping prefabrication and installation on board; Prefabricated and installed total piping length
France, 2021 Scope of work: Supply and installation of PE100 piping (total installed pipe length – 1100m); Supply and installation of Copper piping (total
2021, LITHUANIA Manufacturing of pipe spools for various industry projects: ship repair, shipbuilding, pulp industry, etc.; Included: Various material supplies, galvanization process, surface painting,
France, 2020 Scope of work: Complete renewal of two hotwell tanks steel and piping; Ballast system modification; Renewal of pipes for the preheating system.
Sweden, 2020 Scope of work: Repair of piping for fuel oil system; Ballast water piping manufacturing and installation; Engine cooling piping system (CuNiFe) manufacturing
Sweden, 2020 Scope of work: Water ballast treatment system (WBTS) manufacturing and installation; GRE (fiberglass) pipes manufacturing and installation; Modification of fuel oil and
Sweden, 2020 Scope of work: Water ballast treatment system (WBTS) manufacturing and installation; Renewal of ballast and bilge piping systems; Renewal of potable water
Sweden, 2020 Scope of work: Manufacturing and installation of ballast water treatment pipes. Total weight 29 tons; Installation of all WBTS equipment; Rerouting of
France, 2020 Scope of work : Compressed air manufacturing and installation; BWTS ventilation system manufacturing and installation; Steam turbine lubricating piping and equipment renewal.
Spain, 2020 Scope of work: Ship’s entertainment area conversion into living areas. This includes installation and connection of all piping in new areas as
2020, Finland Prefabrication and installation of stainless steel pipelines for a factory in the food industry, over 5 kilometres of pipelines were installed; The
Sweden, 2020 Scope of work: Refurbishment of 35 pcs. boxcoolers; Overboard pipes renewal and pressure tests; Relocation of Reverse Osmosis and rerouting of piping.