Completed projects

TANKER

Sweden, 2024 Scope of work: Upgrading the Ballast Water Treatment System.

CRUISE LINER

Finland, 2024 Scope of work: Various piping installation works.

TANKER

Denmark, 2024 Scope of work: Prefabrication and installation of new piping systems.

Ro-Ro FERRY

Denmark, 2024 Scope of work: Upgrading the Ballast Water Treatment System.

Ro-Ro FERRY

France, 2024 Scope of work: Installation of the ship’s fire extinguishing pipeline system.  

PASSENGER FERRY

Denmark, 2023 Scope of work: Modernization of the engine exhaust gas line – installation of scrubbers. Installation of new chimneys and chemical tanks. Production

PASSENGER FERRY

Denmark, 2023 Scope of work: Modernization of the engine exhaust gas line – installation of scrubbers. Installation of new chimneys and chemical tanks. Production

PASSENGER FERRY

Denmark, 2023 Scope of work: Modernization of the existing ballast system – production and installation of the BWTS system. Modernization of the sewage system

LNG TANKER

France, 2022 Scope of work: Modernization of the LNG pipeline system. Engine exhaust gas line modernization – SRC system installation. Installation of platforms, foundations,

LNG TANKER

Denmark, 2023 Scope of work: Manufacture of stainless steel pipes for the LNG line. Installation of LNG and other gas pipelines. Installation of hydraulic

LNG TANKER

France, 2023 Scope of work: Installation of cooling equipment. Installation of service systems for LNG pipelines and cooling equipment. Installation of structures – installation

LNG TANKER

France, 2023 Scope of work: BWTS installation – installation of pipelines and equipment. Modification of existing piping systems and structures.

LNG TANKER

Norway, 2022 Scope of work: The existing ballast pipelines were replaced and the diameter of the pipelines was increased. Manufactured and installed steel and

TANKER

France, 2022 Scope of work: Repair of various piping systems works Modernization of piping systems

TANKER

France, 2022 Scope of work: Repair of piping systems Modification of WBTS system

CARGO

Denmark, 2022 Scope of work: BWTS production Installation of BWTS

CARGO

Denmark, 2022 Scope of work: BWTS production Installation of BWTS Reconstruction of existing piping systems  

CHEMICAL INDUSTRY, FACTORY

Sweden, 2022 Scope of work: Production of stainless steel pipes Installation of stainless steel pipelines

CARGO

Denmark, 2022 Scope of work: Dismounting of old BWTS system. BWTS system installation. 3D Design works for new pipelines. Piping systems installed: Ballast piping.

TUG

Denmark, 2022 Scope of work: BWTS system installation. Design works for new pipelines. Piping systems installed: Ballast piping. Air supply lines to new equipment

CARGO

Lithuania, 2022 Scope of work: BWTS Pipes and Equipment foundations prefabricated in our workshop BWTS system installation was performed during the voyage of the

CARGO

Sweden, 2022 Scope of work: Ballast water treatment system pipes production in AVS workshop. Ballast Water treatment system pipes and equipment installation on board.

CARGO

Denmark, 2022 Scope of work: Ballast water treatment system pipes production in AVS workshop. Ballast Water treatment system pipes and equipment installation on board.

CARGO

Denmark, 2021 Scope of work: Ballast water treatment system pipes production in AVS workshop. Ballast Water treatment system pipes and equipment installation on board.

CARGO

Sweden, 2021 Scope of work: Cooling water piping system installation (total installed pipe length – 1000m) Manufacturing and installation of pipes Pressure tests

CARGO

Sweden, 2021 Scope of work: 8 tons of BWTS (ballast water treatment system) pipe products were manufactured at the workshop Installation of BWTS pipelines

CARGO

Sweden, 2021 Scope of work: Manufacturing and installation of GRE and steel pipe spools. Two more BWTS systems were successfully installed ad connected!

PEDESTRIAN FERRY

Finland, 2021 The work scope for all pipelines in the ship: Manufacturing Installation on board Pressure and function test

TANKER

Sweden, 2021 Scope of work: 33 tons of steel piping were manufactured, galvanized, and installed onboard 140 meters or GRE piping lines were manufactured

PASSENGER SHIP

France, 2021 Scope of work: Supply and installation of PE100 piping Supply and installation of Copper piping

CARGO

Sweden, 2021 Scope of work: In the short term prefabricated and installed GRE pipe spools for BWTS system; Installation of foundations for equipment and

TANKER

France, 2021 Scope of work: In short time completed whole LNG sub-cooler piping prefabrication and installation on board; Prefabricated and installed total piping length

PASSENGER SHIP

France, 2021 Scope of work: Prefabrication and installation of piping for new ORC system (3600 kg); Renewal of various pipes in technical spaces –

FERRY

France, 2021 Scope of work: Supply and installation of PE100 piping (total installed pipe length – 1100m); Supply and installation of Copper piping (total

PIPE SPOOL MANUFACTURING IN THE AVS WORKSHOP

2021, LITHUANIA Manufacturing of pipe spools for various industry projects: ship repair, shipbuilding, pulp industry, etc.; Included: Various material supplies, galvanization process, surface painting,

CARGO/CONTAINERSHIP

Sweden, 2020 Scope of work: Renewal of ballast system pipes and valves; Repair of fuel oil piping system; Overboard pipes renewal and pressure tests;

CRUISE LINER

France, 2020 Scope of work: Renewal of overboard pipes; Change of crossover pipes; Repair of ballast water piping system ventilation.

CAR FERRY

Sweden, 2020 Scope of work: Repair of hot water piping system; Seawater cooling piping renewal; Firefighting system modernization.

CRUISE LINER

France, 2020 Scope of work: Complete renewal of two hotwell tanks steel and piping; Ballast system modification; Renewal of pipes for the preheating system.

FERRY

Sweden, 2020 Scope of work: Repair of piping for fuel oil system; Ballast water piping manufacturing and installation; Engine cooling piping system (CuNiFe) manufacturing

GENERAL CARGO

Sweden, 2020 Scope of work: Water ballast treatment system (WBTS) manufacturing and installation; GRE (fiberglass) pipes manufacturing and installation; Modification of fuel oil and

GENERAL CARGO

Sweden, 2020 Scope of work: Water ballast treatment system (WBTS) manufacturing and installation; Renewal of ballast and bilge piping systems; Renewal of potable water

OIL/CHEMICAL TANKER

Sweden, 2020 Scope of work: Manufacturing and installation of ballast water treatment pipes. Total weight 29 tons; Installation of all WBTS equipment; Rerouting of

CARGO/CONTAINERSHIP

Sweden , 2020 Scope of work: Fire extinguishing piping system renewal; Renewal of exhoust pipes for boiler; Renewal of sea-chest pipes.

OIL/CHEMICAL TANKER

Sweden , 2020 Scope of work: Thermal oil and Exhaust gas piping systems: Inspection; Repair works; Tests.

LNG TANKER

France, 2020 Scope of work : Compressed air manufacturing and installation; BWTS ventilation system manufacturing and installation; Steam turbine lubricating piping and equipment renewal.

CRUISE LINER

Spain, 2020 Scope of work: Ship’s entertainment area conversion into living areas. This includes installation and connection of all piping in new areas as

FERRY

Sweden, 2020 Scope of work: Firefighting system piping: Design; Manufacturing; Removal of old system; Installation of new piping; Pressure tests.

OIL / CHEMICAL TANKER MODERNIZATION

2020, SWEDEN Manufacturing and installation of ballast water treatment pipes. Total weight 29 tons.

FOOD INDUSTRY, FACTORY

2020, Finland Prefabrication and installation of stainless steel pipelines for a factory in the food industry, over 5 kilometres of pipelines were installed; The

OFFSHORE SUPPLY SHIP

Sweden, 2020 Scope of work: Refurbishment of 35 pcs. boxcoolers; Overboard pipes renewal and pressure tests; Relocation of Reverse Osmosis and rerouting of piping.