Norway, 2022
Scope of work:
- The existing ballast pipelines were replaced and the diameter of the pipelines was increased.
- Manufactured and installed steel and fiberglass epoxy pipes.
- Connection of BWTS System OceanGuard®.
© 2021 avsprojects.eu | All rights reserved
Web: perse.lt