CARGO

Denmark, 2022

Scope of work:

  • Dismounting of old BWTS system.
  • BWTS system installation.
  • 3D Design works for new pipelines.

Piping systems installed:

  • Ballast piping.
  • Air supply lines to new equipment and valves.
  • Fresh water cooling.
  • Backflush piping.
  • Pressure tests of the installed piping.

Steelworks:

  • Prefabrication of foundations and platforms for the new equipment.
  • Overboard pipe installation